After the completion of grouting, a 1 ft thick gravel layer is poured at the bottom of each hole. |
|
A sonotube is then placed. |
|
2 in diameter PVC pipes are extended into each hole to pull sensor cables. |
|
Reinforcements are then placed inside a wooden box. |
|
Each Borehole is prepared in the same way. |
|
Each box is then filled with concrete. |
|
After the completion of pouring. |
|
Finished concrete block. |
|
Insulating the steal enclosers on concrete blocks. |
|
All four boxes are completed. |